Notice of Location and Design Approval 21713
NOTICE OF LOCATION AND DESIGN APPROVAL P. I. 0016637 EFFINGHAM COUNTY Notice is hereby given in compliance with Georgia Code 22-2-109 and 32-3-5 that the Georgia Department of Transportation has approved the Location and Design of this project. The date of location and design approval is: March 17, 2025 The project is located completely within the City of Springfield, Georgia. The total length of the project is approximately 0.48 mile. The project is located entirely within Georgia Militia District 11. The proposed project is along both sides of SR 21 BU/SR 119/N Laurel Street from Rabun Street to E Madison Street. Improvements include a 5-foot concrete sidewalk, 5-foot on-street bike lane, brick pavers, low cover landscaping, concrete curb and gutter, driveways, trash receptables, benches, ADA ramps, pedestrian lighting, on-street parking, and striping. From Second Street to New Stillwell Road, improvements include a 5-foot sidewalk, brick pavers, low cover landscaping, concrete curb and gutter, driveways, trash receptables, benches, ADA ramps, pedestrian lighting, on-street parking, and striping. City of Springfield would be responsible for acquiring property rights for this project. Drawings or maps or plats of the proposed project, as approved, are on file and are available for public inspection at: Matthew Morris, City Manager City of Springfield mmorris@springfiledga.org 130 S Laurel Street Springfield, GA 31329 (912) 754-7617 Any interested party may obtain a copy of the drawings or maps or plats or portions thereof by paying a nominal fee and requesting in writing to: Kimberly W. Nesbitt, State Program Delivery Administrator Office of Program Delivery Attn: Teresa Scott tscott@dot.ga.gov 600 West Peachtree St NW Atlanta, GA 30308 (912) 269-0163 Any written request or communication in reference to this project or notice SHOULD include the Project and P. I. Numbers as noted at the top of this notice. 21713 4/16/25 RL